Species Information
Species:
Observation Method(s):
Individual(s) Observed (seen)
Certainty of Identification:
80
When
Date Time:
Thursday, April 26, 2018 (All day)
Date/Time Precision:
±86 400 seconds
Survey
Survey Site:
Hells Canyon
Survey Intensity:
fairly thorough
Population
EO Number:
1
EO ID:
4329
EO History:
revisit
More potential habitat to survey:
no
Suggestions for other areas to survey:
Areas downstream of the dam were not checked during this survey, but were checked in previous surveys.
Monitoring or research needs for this population:
Plants near the Hells Canyon Dam road should be monitored for impacts from right-of-way (ROW) maintenance activities. Plants outside the ROW appeared to be vigorous and no disturbances were noted. The area is very steep.
Management needs for this population:
Idaho Power biologists are working with Idaho Power crews in the canyon to facilitate required ROW maintenance activities near known plants. Herbicide contractors and vegetation/rock removing crews were notified of general occurrence locations and instructed to limit activities in these areas.
Where
Location Precision:
±10 meters
Mapped full extent:
yes
Region:
County:
Game Management Unit:
Location:
Decimal Degrees: 45.1,-116.6
How
Who
Source Agency:
Idaho Power Company
SA code (IDFG Reference Code):
Verification Status:
Trusted
Count:
1500
Count Type:
A Minimum