When will the 2013 second (2nd) chance drawing for available controlled hunts be listed, along with the application period?
Thanks.
Answer:
The list will be out in early August (after the first). Vendors will receive a list on their License machines and the list will be available on the IDFG website. The application period is August 5-15.
Answered on:
Monday, July 22, 2013 - 2:43 PM MDT